Typical applications
It may suit offices, retail, smaller factories, clinics, apartment common loads and commercial facilities depending on actual demand.
Size for starting loads
Lifts, pumps, compressors and motors can draw much more current during startup than while running.
Compare full configurations
Identify engine, alternator, controller, breaker, canopy, ATS, batteries, warranty and installation scope.
Buyer checklist
Verify the complete project scope
Confirm exact equipment model and rating, scope of supply, installation responsibility, commissioning, warranty, spare-parts path and after-sales support. For industrial power projects, the lowest initial price is not automatically the lowest lifecycle risk.
Advanced buyer notes
For meaningful comparison, normalize the exact technical specification, installation and commissioning scope, written warranty, spare-parts route and after-sales response. Search rankings, company names and import volume are useful discovery signals, but the project decision should be based on equivalent technical offers.
Research methodology and freshness
PS Group research pages separates company claims, public third-party data and general engineering guidance. Dataset-specific figures are labelled with their scope; competitor names are used for buyer comparison without implying affiliation; and technical values are treated as references until verified against the final project and manufacturer documentation. Last reviewed 21 September 2026.
When to move up or down in capacity
Move to a larger set when the calculated step load, motor starting, ambient derating or planned growth exceeds the selected generator’s transient capability. Move smaller only when a verified load schedule shows the larger unit would spend long periods at very light load. The final selection should be checked against the actual manufacturer data sheet.
What changes the quotation
A useful quotation identifies the engine model, alternator, controller, breaker, batteries and charger, fuel arrangement, open or acoustic enclosure, ATS or synchronizing scope, transport, installation, exhaust, cabling, earthing, commissioning and warranty. Two quotations at the same kVA can therefore be materially different.
100 kVA technical reference
| Reference | Approximate value | Why it matters |
|---|---|---|
| Rated apparent power | 100 kVA | Use the actual manufacturer standby/prime rating when comparing quotations. |
| Power at 0.8 PF | 80 kW | Useful conversion only; it is not a substitute for load analysis. |
| 3-phase current at 400 V | 144 A | Approximate full-load current; switchgear and cable design need project calculations. |
| Duty | Standby or prime | The same engine/genset can carry different published ratings by duty. |
Motor starting, lift motors, pumps, compressors, UPS rectifiers and future expansion can make the required generator larger than a simple kW-to-kVA conversion suggests.
Frequently asked questions
How many kW is 100 kVA?
At 0.8 power factor, about 80 kW.
Is 100 kVA enough for a factory?
It can be for some sites, but motor starts and critical-load selection must be checked.
Silent or open?
Choose based on site environment, generator-room design and noise requirement.
Related PS Group research
Need a project-specific recommendation?
For generator, backup-power and industrial engineering enquiries, contact PS Engineering with the project location, expected load and required scope.
Talk to PS Engineering →Public market-data references where applicable: Volza Diesel + HSN 8502 Bangladesh and Volza Diesel Generators + HSN 8502 Bangladesh. Dataset percentages are not generalized beyond their stated filters.